Blog

Investments in sustainable energy: Solar panels at our facility

Monting Montage built a 149.5 kWp photovoltaic power plant on the roof of the business building. The power plant was commissioned on 1. March 2025.

Monting Montage built a 149.5 kWp photovoltaic power plant on the roof of the business building. The power plant was commissioned on 1. March 2025. This power plant will contribute to significant electricity savings in the facility, then increase the use of clean energy and decrease air pollution, which is becoming an increasing problem, especially in the winter months.

Share the Post:

Similar news