Installation of converter modules for Green Line – Wilster Nordlink

“Wilster NordlinkThe so-called “green line” is a line that connects the Norwegian hydroelectric power plant with Germany, i.e. With a converter and substation, German wind power is also added to this. Electricity can flow in both directions. from Norway to Germany and vice versa depending on the load and need.

 Wilster Nordlink is a milestone in the realization of the energy transition.
Monting Montaža participated in the assembly of converter modules for the so-called “green line”, which connects and uses German wind energy and Norwegian water energy to generate electricity. We did the installation of valves, installation of valve frames, laying and connections of pre-configured cables as well as installation and connections of accompanying reflectors.