Flughafen Frankfurt Terminal 3 Pier H&J
The works at Pier H&J Terminal 3 represent a significant step forward in improving the infrastructure of Frankfurt Airport, one of the busiest and most important in Europe. They include the construction of new waiting rooms, restaurants and shops, as well as the expansion and modernization of technical systems, air conditioning, ventilation, as well as advanced security and immigration control systems.
Monting assembly has done a number of specific tasks, such as:
- Installation of different ceilings with heating and cooling system
- Installation of special GK ceilings and walls Cubic
- Installation of wooden walls
- Window trim for GK
- Installation of Customs Control Tables
This improves the functionality of the space and contributes to the aesthetic experience. All these changes will certainly provide better service to passengers and further increase the capacity of the airport for future challenges.